Lithgow Interface Piping Installation Works
Abergeldie Complex Infrastructure
Client:
Value:
Completion:
$6m
2019
Location:
Lithgow, NSW
-
9km complex pipeline
-
Complex service locating
-
Major rock trenching
-
Butt fusion poly welding
-
Hydrotesting High-density brownfield
Running in conjunction with works on the Raw Water Transfer Pipeline, GCC undertook the installation of nine pipelines which carry water between the proposed Water Treatment Facility,storage ponds and Mount Piper Power Station.The pipelines which is 9kms in HDPE, range in pipe specification(HDPE & CPVC) and diameter (180mm - 900mm).
Works included all service locating, trenching, excavating,butt fusion welding, pipe assembly, installation of the pipeline components and 8,900m of electrical and data conduits. The scope also included the commissioning and testing of all air valves, hydrants and scour valves.